Precautions for installation of steel strand testing machine

2025-03-11 10:30:00
times

For the service life and safety of the testing machine, the following points need to be noted during the installation process:

1. Install on a stable workbench or a flat and sturdy ground;

2. It should be kept away from places with high air flow such as doors and windows as much as possible;

3. There is no obvious electromagnetic interference in the environment;

4. Prevent exposure to sunlight or getting close to air conditioning equipment, etc;

5. Environmental temperature: 20 ± 5 ℃ and fluctuation less than 2 ℃ per hour; Relative humidity: ≤ 80%;

6. Power supply: AC 380 ± 10V 50Hz power 3.0KW;

8. It is required that the power supply must have a grounding wire. Users should pay special attention to this because the machine has grounding protection. If a power supply with a grounding wire is not used, there may be a risk of injury in case of leakage;

9. Horizontal adjustment: Place the level on the testing machine platform and adjust the four adjustable feet below to make the testing machine's testing platform level.